To obtain a position in the commercial construction industry in either public or private works.
Harold Honeywell
4 Via Maya
Rancho Santa Margarita, Ca 92688
Home Phone (949) 709-5617; Cell Phone (949) 690-3835
OBJECTIVE
To obtain a position as a Project Superintendent in commercial construction with the ability to do either public or private works.
SUMMARY
Four-year trade apprenticeship; four-years of college majoring in accounting; well versed in the Windows XP/Vista environment; experienced with the scheduling of projects utilizing Suretrack or Microsoft’s Project; attended a three-semester management writing course at Skyline College. Studied web publishing.
WORK HISTORY
2003-Present Senior Project Superintendent Howard S. Wright, Irvine, CA
• Supervised the construction of numerous projects in Southern California
• Scheduled projects from inception to completion
• Facilitated the on-time completion of every project
1998-2003 Project Superintendent, Taisei Construction, San Francisco, CA
• Supervised the building of hotel, theater, and resort projects
• Responsible for schedules, manpower allocation, reporting processes, and the safe operation of the project
• Developed an ever-expanding leadership role within the corporate environment
1997-1998 Project Manager, World Premier Investments, Santa Ana, CA
• Managed numerous retail projects from buyout to closeout
• Wrote contracts, scheduled subcontractors, and developed leadership skills
• Showed adaptability by stepping into the role of project management
EDUCATION
§ Carpenter’s Apprenticeship Program, 1974-1978
§ University of Alaska, School of Accounting, 1974-1979
§ San Jose’s Continuing Education Program, Project Management, 1998
§ Skyline College’s “Management Writing Practicesâ€, 1998-1999
§ CPR/First Aid Certified, 2002
§ Skyline Community College Website Design Program, 1999-2000
§ OSHA Ten-hour program, 2005
AWARDS RECEIVED
• Meritorious Unit Commendation, United States Navy, 1972
Construction Matrix
Company Project Cost Type of Construction CM or Self Perform
Howard S Wright San Francisco Marriot Hotel $26 million The renovation of a 30-story hotel complete with new rooms, room mep, new restaurants, meeting rooms and a new lobby. Construction Management
Howard S Wright South Coast Plaza $35 million The removal and replacement of 300,000 sq ft of flooring during which building was completely occupied. Also installation of a glass elevator and the removal and replacement of a large water feature. Construction Management
Howard S Wright Buena Park BMW $15.0 million Two-story building consisting of plaster/store front exterior and high end finishes in the interior plus a sevice/parking garage area. Construction Management
Howard S Wright City of Newport Beach Library and Tennis Courts $11.5 million Single-story building consisting of plaster exterior and high end finishes for the interior, 38,000 sq ft total. Plus installed two tennis courts that were next to library. Construction Management
Howard S Wright City of Ranch Santa Margarita City Hall & Community Center $17 million Two Single-storied buildings consisting of plaster exterior and high end finishes for the interior; 52,000 sq ft total Construction Management
Taisei Construction Calistoga Ranch $30 million Resort Complex consisting of 120 Wood-framed units on pilings, and wood-framed BOH buildings; New restaurant and a wine cave was also built; 86,000 sq ft of units; 26, 000 ft of BOH; also put in all infrastructure and rebuilt a damn. Construction Management
Taisei Construction Daly City Retail/Cinema $18 million 130,000 sq ft building consisting of brace-frame steel construction, pan deck and concrete, and EIFS exterior Construction Management
Taisei Construction Hilton Garden Inn Mountain View $13.5 million Four-story post tension concrete deck, steel-stud exterior w/stucco skin; 86,000 sq ft Construction Management but did the entire layout for the concrete contractor.
World Premier Investments Pahrump Lucky/Savon $12.5 million CMU Exterior (split-faced) w/post and beam steel superstructure and metal stud and GWB interior; 81,000 sq ft We performed the concrete work. I was the Project Manager on this project.
MBK Construction AMC 30-plex Ontario Mills $18 million Tilt up exterior w/post and beam steel superstructure and metal stud and GWB interior; 135,000 sq ft Combination…we did the push on the concrete but subcontracted everything else.
MBK Construction AMC 20-plex Tallahassee $12 million CMU exterior (split faced) w/post and beam steel superstructure and metal stud and GWB interior; 78, 000 sq ft Combination…we did the push on the concrete but subcontracted everything else.
MBK Construction Houston AMC Remodel $1.3 million A remodel of an existing retail space to add more screens. Consisted of demo of the retail space and floors to accommodate the sloped seating w/metal studs and GWB interior; 6,000 sq ft Combination…we did the push on the concrete but subcontracted everything else.
W.E. O’Neil Holiday Inn Express Grand Canyon $5.5 million 165 unit, four-story CMU exterior w/precast decking w/wood truss roof and metal stud and GWB interior; 81,000 sq ft Did the concrete work. I did the entire layout and pushed the crew.
Federal Builders Tank Maintenance Facility – Fort Huachuca, Sierra Vista, Az $9.5 million 22,000 sq ft split face block/structural steel building complete with u/g hydraulic/gas/oil piping system to service tanks. Offices/service bays were also installed Performed on the concrete, steel, block
Federal Builders Company Command Facility – Fort Irwin, Ca $7.5 million Two 12,000 sq ft split faced block/structural steel buildings with complete build out for Army Tank Command facility at Fort Irwin Performed on the concrete, steel, block
Federal Builders Federal Courthouse – San Diego, Ca $18 million A complete remodel of the Federal Courthouse consisting of new courtrooms with all finishes, a complete renovation of the footprint of the facility to encompass more courtrooms, working on the facility while the courts remained open. Did all structural steel, concrete, framing, drywall and finishes.
References
1. Jim Trammel – Vice-president of Construction, Griffin Structures: 949-244-9877
2. Chris Morris – Vice-president of development, Huffman Development: 949-425-8362
3. Chris Palermo – Project Executive, Howard S. Wright Construction: 415-748-1779
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.